BOKOR OILFIELD, SARAWAK
Type Of Work Jacket Leg, Member & Clamp Grouting Location Bokor Oilfield that is located off the Baram Delta Offshore,
Sarawak in the South China Sea, Malaysia. Client PETRONAS Carigali Sdn Bhd Total Manhour 12,056 with zero LTI Year Completed 2009
SUMMARY OF WORK
RIVERSON ENGINEERING undertook the work of strengthening tubular structures (jacket legs), tubular braces and joints by utilizing the method of injecting Ultra High Performing Cementitious (UHPC) materials into the tubular or annuli. The structural performance of Ducorit UHPC in-filled tubular and joints was thoroughly studied through physical model test campaigns and Finite Element Modelling. It has been successfully used for structural strengthening, unstressed grouted clamps, pile sleeve connections and protection of offshore structures for above and below the sea level.